This thread is timely for me....
I just added my MTU2 for my solar array today. With just 1 MTU, things were working great, but now that I've switched MTU1 from LOAD to ADJUSTED LOAD, it's now showing negative. Damn. I read that's because it was probably always negative, but the MTU setting of LOAD always forces values to positive, so I never knew. Now that I need it to be at ADJUSTED LOAD, I'm realizing that I must have the CT clamps "wrong".
So, RussellH, your previous post tells me I can EITHER swap MTU1 CT clamps to opposite wires OR keep them on the same wires, but switch the direction of the dots, correct? If so, I'll leave the directions of the dots (pointing at the energy supply source) and just switch the two CTs to opposite wires. I would much appreciate confirmation on this. Next, once my PUC gives me my PTO, I'll finally see if I've got my MTU2 CTs in the correct order....but, I have to wait for that....