I have a second MTU monitoring grid-tied solar generation. The PV system backfeeds the main breaker panel with a 35A 2-pole breaker. I am using two 20A CTs, one on each leg of the 35A breaker. Will this work correctly or must I use the 200A CTs?
If the 20A CTs will work, do I have to do any calibration?